Flooring
Floor Preparation
Floor preparation is the foundation of every project we take on. Before any finish is installed, the substrate is assessed and brought to a condition suitable for the specified flooring.

- Assessment of the existing substrate, levels and condition
- Removal of unsuitable material, old adhesives and failed coverings
- Mechanical cleaning and preparation of the surface
- Priming appropriate to the substrate and the following stage
- Preparation for levelling, screeding or direct installation
- New-build concrete substrates
- Existing timber and concrete floors
- Refurbishment where old floor coverings have been removed
- Preparation ahead of LVT, vinyl, laminate or tiling
How the work runs.
- 01
Assess
We look at the existing substrate, levels and condition, and agree what the finished build-up needs to be.
- 02
Prepare
Cleaning, removal of unsuitable material and priming so the following stages bond and perform as intended.
- 03
Level
Levelling or screeding where required to achieve an even, suitable surface.
- 04
Install
Careful installation of the specified floor finish, working to accurate lines and levels.
- 05
Finish
Trims, edges and finishing details completed, with the area left clean.
Floor Preparation questions.
02Self-Levelling
Levelling compounds applied to create an even, suitable base for the finished floor.
Learn more
03Screeding
Screed build-ups that establish accurate finished floor levels across a space.
Learn more
04Tiling
Floor and wall tiling in porcelain, ceramic, mosaic and large-format formats.
Learn moreHave a project in mind?
Tell us about your project and send a few photos for an initial assessment.