Screeding creates the layer between the structural base and the finished floor. It is used where a greater depth or a defined floor build-up is required rather than a thin levelling layer.

Screeding — Levellore
What we do
  • Setting out and confirming finished floor levels
  • Substrate preparation and any required separation or insulation layers
  • Placing and levelling the screed
  • Working to agreed falls where required
  • Protection of the screed while it cures
Applications
  • New floor build-ups
  • Level corrections across larger areas
  • Floors receiving tiling or resilient finishes
  • Build-ups incorporating underfloor heating (coordinated with the relevant trades)
The Process

How the work runs.

  1. 01

    Assess

    We look at the existing substrate, levels and condition, and agree what the finished build-up needs to be.

  2. 02

    Prepare

    Cleaning, removal of unsuitable material and priming so the following stages bond and perform as intended.

  3. 03

    Level

    Levelling or screeding where required to achieve an even, suitable surface.

  4. 04

    Install

    Careful installation of the specified floor finish, working to accurate lines and levels.

  5. 05

    Finish

    Trims, edges and finishing details completed, with the area left clean.