Screeding creates the layer between the structural base and the finished floor. It is used where a greater depth or a defined floor build-up is required rather than a thin levelling layer.

- Setting out and confirming finished floor levels
- Substrate preparation and any required separation or insulation layers
- Placing and levelling the screed
- Working to agreed falls where required
- Protection of the screed while it cures
- New floor build-ups
- Level corrections across larger areas
- Floors receiving tiling or resilient finishes
- Build-ups incorporating underfloor heating (coordinated with the relevant trades)
How the work runs.
- 01
Assess
We look at the existing substrate, levels and condition, and agree what the finished build-up needs to be.
- 02
Prepare
Cleaning, removal of unsuitable material and priming so the following stages bond and perform as intended.
- 03
Level
Levelling or screeding where required to achieve an even, suitable surface.
- 04
Install
Careful installation of the specified floor finish, working to accurate lines and levels.
- 05
Finish
Trims, edges and finishing details completed, with the area left clean.
Screeding questions.
01Floor Preparation
Assessment, cleaning, removal of unsuitable material and priming before any floor finish is laid.
Learn more
02Self-Levelling
Levelling compounds applied to create an even, suitable base for the finished floor.
Learn more
04Tiling
Floor and wall tiling in porcelain, ceramic, mosaic and large-format formats.
Learn moreHave a project in mind?
Tell us about your project and send a few photos for an initial assessment.