Flooring
Laminate Flooring
Laminate is straightforward when the base is right. We prepare the surface, install the correct underlay and set out the floor so joints, expansion gaps and trims are consistent.

- Floor preparation and levelling where required
- Underlay selection and installation
- Setting out and laying of laminate boards
- Expansion gaps, thresholds and door undercuts
- Skirting or beading finish
- Bedrooms and living areas
- Hallways and landings
- Rental and refurbishment projects
How the work runs.
- 01
Assess
We look at the existing substrate, levels and condition, and agree what the finished build-up needs to be.
- 02
Prepare
Cleaning, removal of unsuitable material and priming so the following stages bond and perform as intended.
- 03
Level
Levelling or screeding where required to achieve an even, suitable surface.
- 04
Install
Careful installation of the specified floor finish, working to accurate lines and levels.
- 05
Finish
Trims, edges and finishing details completed, with the area left clean.
Laminate Flooring questions.
01Floor Preparation
Assessment, cleaning, removal of unsuitable material and priming before any floor finish is laid.
Learn more
02Self-Levelling
Levelling compounds applied to create an even, suitable base for the finished floor.
Learn more
03Screeding
Screed build-ups that establish accurate finished floor levels across a space.
Learn moreHave a project in mind?
Tell us about your project and send a few photos for an initial assessment.