Flooring
LVT & Vinyl
LVT and vinyl show every imperfection beneath them. Our work starts with the substrate and finishes with a clean, accurately set-out floor.

- Substrate assessment, preparation and priming
- Levelling where required
- Setting out and installation of LVT or sheet vinyl
- Cutting to detail around thresholds, doors and fixtures
- Trims, edges and finishing
- Living areas
- Kitchens and hallways
- Bathrooms and utility spaces
- Residential refurbishment
How the work runs.
- 01
Assess
We look at the existing substrate, levels and condition, and agree what the finished build-up needs to be.
- 02
Prepare
Cleaning, removal of unsuitable material and priming so the following stages bond and perform as intended.
- 03
Level
Levelling or screeding where required to achieve an even, suitable surface.
- 04
Install
Careful installation of the specified floor finish, working to accurate lines and levels.
- 05
Finish
Trims, edges and finishing details completed, with the area left clean.
LVT & Vinyl questions.
01Floor Preparation
Assessment, cleaning, removal of unsuitable material and priming before any floor finish is laid.
Learn more
02Self-Levelling
Levelling compounds applied to create an even, suitable base for the finished floor.
Learn more
03Screeding
Screed build-ups that establish accurate finished floor levels across a space.
Learn moreHave a project in mind?
Tell us about your project and send a few photos for an initial assessment.