Skip to content

Flooring

Underfloor Heating

Our involvement with underfloor heating is on the flooring side: the build-up, preparation and the finished floor above the system. Electrical and plumbing connections are carried out by the appropriate registered contractors.

Underfloor Heating — Levellore
What we do
  • Advice on floor build-up over heating systems
  • Substrate preparation and priming
  • Levelling or screeding over the system where required
  • Installation of suitable floor finishes above the system
  • Coordination with the electrical or plumbing contractor on site
Applications
  • New-build floor build-ups
  • Refurbishment where a heating system is being installed
  • Tiled floors over underfloor heating
  • Resilient finishes suitable for use with heating systems
The Process

How the work runs.

  1. 01

    Assess

    We look at the existing substrate, levels and condition, and agree what the finished build-up needs to be.

  2. 02

    Prepare

    Cleaning, removal of unsuitable material and priming so the following stages bond and perform as intended.

  3. 03

    Level

    Levelling or screeding where required to achieve an even, suitable surface.

  4. 04

    Install

    Careful installation of the specified floor finish, working to accurate lines and levels.

  5. 05

    Finish

    Trims, edges and finishing details completed, with the area left clean.

FAQ

Underfloor Heating questions.

Request a Quote

Have a project in mind?

Tell us about your project and send a few photos for an initial assessment.